Contents

Work

Work reports

Record work and material on site and have the customer sign.

Open in EaseAcc

A work report records on site what was done: people and times, material, text and photos. The customer signs right on the phone or tablet, confirming the work.

Work report with working time, staff, material and preview

Writing a work report

  1. 1Work reports → Work report, or from an appointment in the calendar.
  2. 2Choose customer / project and date.
  3. 3Describe the work done.
  4. 4Under working time enter staff with from/to and service (add more people as needed).
  5. 5Add material from products or as free text, attach photos.
  6. 6Have it signed: the customer enters their name and signs on the screen.

Work report on the phone

After signing

  • The report cannot be changed any more and is available as a PDF.
  • Creating an invoice takes times and material into an invoice draft. Several reports can be billed together from the list.
  • If you keep van stock, the material is booked out of the van.

Work reports with status and signature

Tip: Working by the hour at the customer? A service call is quicker: clock in, clock out, get it signed. The work report is made along the way, and the invoice too.

Keywords: work report · job report · signature · time and material